Pedestrian Deck

The Sudirman Dukuh Atas Pedestrian Deck is a visionary project focused on seamlessly integrating public transportation systems, including MRT, LRT, Commuter Train, and Airport Train in Jakarta's busiest business district. This initiative sims to significantly enhance commuter connectivity and accessibilty, transforming Sudirman Dukuh Atas into a modern, interconnected district. The project's centerpiece, ...

   Rp. 361,70 Billion

  

  

Jenderal Sudirman street


6'1208.9'S 106'49'22.1'E

View Project  

Transit Hub Mega Kuningan

Connecting people’s home and workplace, Transit Hub Mega Kuningan brings better mobility and improve the quality of life of Mega Kuningan’s residents. Located in the heart of Mega Kuningan, the project is envisioned as a central hub of activity and mobility in the area with large indoor motorcycle parking and ...

   Rp. 27,20 Billion

  

2025

  

Dr. Ide Anak Agung Gede Agung street, Setiabudi, South Jakarta

-6.230139, 106.827167

View Project  

Transit Park Prapanca

Creating an attractive and inclusive nature-based public space in the vibrant heart of South Jakarta, Transit Park Prapanca brings nature into the city and space for the public, creating both healthy lifestyle and lively community events. Spanning just over 1 (one) hectare, the park is envisioned to become the next ...

   Rp. 40,80 Billion

  

2025

  

Prapanca Raya street No.9, Kebayoran Baru, South Jakarta

-6.249000, 106.808861

View Project  

Jakarta Sewerage System Zone 8

The project is part of the Jakarta Sewerage System program, which aims to develop and manage domestic wastewater treatment across 15 zones, including those currently in operation.The primary objective of this project is to improve environmental conditions in Jakarta Zone 8 by collecting and treating 80% of the domestic wastewater ...

   Rp. 13,40 Trillion

  

2027

  

North Jakarta

-6.109870, 106.962498

View Project  

IPALD Simatupang - Phase II

The construction plan for the sewer pipeline network and the Domestic Wastewater Treatment Plant (WWTP) in the TB Simatupang area is divided into two phases. The total planned length of the wastewater pipeline network is 7,616 meters, with a WWTP capacity of 6,000 m³/day. Service coverage for this project is ...

   Rp. 186,00 Billion

  

2026

  

Cilandak Water Treatment Plant Perumda PAM Jaya Area (TB. Simatupang)

-6.293412, 106.806538

View Project  

AB Dharmawangsa

PAM JAYA has identified non-productive land and building assets across Jakarta, and many assest in prime locations. PAM JAYA intends to optimize high-value land, especially in South Jakarta. One of the assets owned by PAM JAYA is located in a premium area in the Dharmawangsa Business area. This land located ...

  

  

2026

  

Darmawangsa Raya street No.4-8, RT.8/RW.1, Pulo, Kebayoran Baru, South Jakarta, 12160

-6.255351, 106.798676

View Project  

NRW Reduction

In alignment with Governor Regulation No. 7/2022 and PAM JAYA's strategic business plan, the Jakarta Provincial Government and PAM JAYA are commited to achieving 100% clean water service coverage by 2030. This ambitious goal is a cornerstone of the Jakarta Regional Spatial Plan (Jakstrada), where the reduction of Non-Revenue Water ...

  

  

2026

  

Various locations all around Jakarta

View Project  

WTP Kanal Banjir Barat 2

To support the increasing demand for clean water in Jakarta, a new water treatment plant (IPA) at Kanal Banjir Barat (KBB) 2 will be built on a 9,000 m² site located approximately 3 km from the coastline, downstream from the existing IPA Hutan Kota 1.The raw water source will be ...

  

  

2025

  

Kepanduan II street - Penjaringan

-6.124216, 106.775498

View Project  

WTP Semanan

To support the target of clean water service coverage target of 100% in Jakarta by 2029, PAM JAYA plans to develop a new water treatment plant, IPA Semanan. The facility will be built on a 16,034 m² site fully owned by PAM JAYA, with approximately 3,200 m² allocated for the ...

  

  

2025

  

Duri Kosambi – Cengkareng

-6.173708, 106.709468

View Project  

WTP Condet

PAM JAYA plans to redevelop the IPA Condet facility, which is currently non-operational due to corrosion issues and a capacity no longer adequate at 50 liters per second (lps). Based on raw water quality assessments and available land, a new water treatment plant with a design capacity of 1000 lps ...

  

  

2025

  

Balai Rakyat Street No 79, Kramat Jati District, East Jakarta

-6.292694, 106.854000

View Project