Jakarta Sewerage Development Project Zona 5





Project Overview

Project Area

4,6 Ha of 20 sub-district in 5 district in Northern & Central jakarta

Capacity WWTP

109.000 m³/day

Population Coverage

696.849 PE

Location WWTP

Nort side of Waduk Sunter Utara

Total of pipe leght

458.775 m

Diameter Ø

200 - 2000 mm

Scope of Work

  • DED / Basic Design if will be done by Design and Build
  • Construction Supervision / Project Management
  • WWTP construction
  • Pipeline construction (Truck Main Pipe, Main Pipe, secondary/Tertiary pipe)
  • House connection instralation

Cost Estimation / Investment (* in million Rupiah)

  • Physical Cost (Sewer Network Construction) = Rp. 3.292.730*)
  • Non Physical Cost (DED / Basic Design, Project Management Contingencies & VAT) = Rp. 889.037*)
  • WWTP = Rp. 1.216.985 (MBBR) / Rp. 1.183.896 (FBAS) / Rp. 1.194.858 (G-SBR)*

Investment Cost
IDR. 5,40 Trillion