WTP Kanal Banjir Barat 2





Project Overview

To support the increasing demand for clean water in Jakarta, a new water treatment plant (IPA) at Kanal Banjir Barat (KBB) 2 will be built on a 9,000 m² site located approximately 3 km from the coastline, downstream from the existing IPA Hutan Kota 1.

The raw water source will be the West Flood Canal (Kanal Banjir Barat). Given the high salinity levels in this area, the plant will utilize Reverse Osmosis (RO) technology, capable of treating water with Total Dissolved Solids (TDS) levels exceeding 10,000 ppm. This strategic development aims to enhance Jakarta’s water resilience, particularly in coastal areas, by leveraging high-capacity RO technology for challenging water conditions.

Market Opportunity :

  • With a capacity of 500 lps, the system is capable of connecting approximately 40,000 houses.
  • Based on future demands, a capacity of 950 lps is projected to connect an estimated 76,000 houses.

Target Market :

  • Future Demands/Total Customer: 76,000
  • Based on a Total Capacity 500 lps, it can serve 40,000 house connection.
Investment Cost
IDR. 400,00 Billion

Land Area : 90,000 m2
Allocation Supply : 500 lps
Demand : Assuming 1 lps serves 80 house connection Future Demands / Total Customer 76,000


Financial Analysis

Net Present Value : IDR 16 Bio
Investment Rate of Return : 9.94%
Weighted Average Cost of Capital : 9.38%
Payback Period : 8 years

Expected Start Date

2025

Location

Kepanduan II street - Penjaringan

-6.124216, 106.775498

Contact Info

Name : Hery Suyanto
Title : Senior Project Manager
Email : Hery.Suyanto@pamjaya.co.id 