PAM JAYA plans to redevelop the IPA Condet facility, which is currently non-operational due to corrosion issues and a capacity no longer adequate at 50 liters per second (lps). Based on raw water quality assessments and available land, a new water treatment plant with a design capacity of 1000 lps will be constructed.
The intake source will be the Ciliwung River, the treatment process will adopt MBBR technology along with coagulation, flocculation, and sedimentation. PAM Jaya plans to build WTP Condet in Kramat Jati district with supply comes from WTP Buaran 3 and will be transmitted to the South area to reinforce East Jakarta South side.
Market Opportunity :
Target Market :
Land Area : 8,477 m2
Allocation Supply : 1,000 lps
Demand : Assuming 1 lps serves 80 house connection Potential Customer 80,000
Net Present Value : IDR 159 Bio
Investment Rate of Return : 14.36%
Weighted Average Cost of Capital : 9.38%
Payback Period : 7.5 years